Cabling: Expansion Chassis
The AMS Express supports up to 3 expansion chassis per primary chassis. Each expansion chassis is delivered with the following cables needed for installation.
- From the rear of the system, attach the cables as shown in the following step.
-
SAS Expansion - Connect the Expansion chassis to the
Primary chassis using the following diagrams depending on the number of chassis.
Each connection scheme maximizes redundancy.
- SAS Cabling: 2 chassis stack
- AC Power Cords - Two (2) AC line cords are required per chassis for redundancy purposes. These are not supplied with the units. Customer must supply a certified power cord with its country of destination approval marking on the cable, plug or connector. Please see plug specifications in Cabling: Primary Chassis.