System Power-On

Important: Both Nodes must be powered on within 15 seconds of each other. Prepare both Nodes before turning power on. Not doing so results in fenced nodes and an unstable system.
  1. Login to both BMC Nodes.

    You will see power logo red/off in upper-right corner.

  2. On both Nodes, select Remote Control | Power Control.

    The Power Control window appears.

  3. Ensure radio-button is set to Power On Server on both Nodes.
  4. On Node1, click Perform Action. Then immediately on Node 2, click Perform Action.

    Systems will now power on in the next 15 minutes.

When both VM Status windows show all VMs running, proceed to Ethernet Speed Override.


Copyright © 2021 GVBB Holdings SARL and Grass Valley USA, LLC. All rights reserved. Specifications are subject to change without notice. AMS Express gvtp_20210507_00:49:21