Changing the Project Setting (Detailed Settings)
Change the project settings by modifying the detailed settings of an existing project preset.
Note
|
-
The settings of the original preset will not be changed if you change the project settings of a project you are currently editing.
To create a new project preset or change the existing project preset settings, use [Application] in [System Settings]
→
[Project Preset].
Project Preset/Project Template
-
When changing the settings for [TC preset], [TC Mode], [Total Length], and [Channel map] in the project settings while editing a project, the change is not reflected in the created sequence. Change the settings of the created sequence in the [Sequence settings] dialog box for each sequence.
Sequence Settings
|
1)
Click the [Save Project] list button on the timeline.
2)
Click [Project Settings].
Alternative
3)
Select a project preset, and click [Change current setting].
4)
Change the settings, and click [OK].
To Top