Other Topic Library Versions

Power Up Routine

  • All video inputs should be connected prior to powering the system on.
  • The auto-sensing for incoming signals is done on power up of the server.
  • Once the individual pieces of the system are connected and ready for power up the server should be powered on first.
  • After the server has up and operational the control surface should then be powered on.

Copyright © 2015 Grass Valley USA, LLC. All rights reserved. GV Director gvtp_20150507_10:09:45