Front view

The front view of the GV I/O Live Ingest and Playout Server front bezel is shown below. The front bezel should be installed after rack mounting the server. It should remain installed during normal operation for proper cooling of the unit.


Copyright © 2018 - 2021 GVBB Holdings SARL and Grass Valley USA, LLC. All rights reserved. Specifications are subject to change without notice. GV I/O 4.0 gvtp_20210305_00:38:42