Prepare for upgrade via SiteConfig

Before upgrading, do the following:

  • All GV I/O systems must be configured according to these latest cabling instructions.
  • Connect the Control and FTP/SMB network cables to RJ45 10G network ports.
  • Procure the software installation files for this release via the appropriate distribution method, such as download, network drive, or removable media drive.
  • Install the latest SiteConfig application and Discovery Agent.
  • Install all Important Windows updates.
  • Using the Windows Programs and Features Control Panel, uninstall the Java JDK software from Oracle.
  • Stop all media access on the GV I/O devices you are upgrading.
  • Shut down all applications on the GV I/O devices you are upgrading.
  • Reboot the GV I/O device and access the BIOS settings to change Node Interleaving = Disabled in the Memory Settings section.
  • Open the Embedded Security Manager and set the GV I/O device into Update mode.

Copyright © 2018 - 2021 GVBB Holdings SARL and Grass Valley USA, LLC. All rights reserved. Specifications are subject to change without notice. GV I/O 4.0 gvtp_20210305_00:38:42