Prerequisites for initial configuration - Basic Proxy Storage
Before beginning your initial configuration, make sure the devices of the Proxy Storage system meet the following prerequisites.
Control point PC
- Ethernet cable connected
- Control Point software must be installed
- Control network IP address must be assigned
- There must be network communication over the control network with all other K2 devices
- Power must be on
Ethernet switch
- Ethernet cables connected
- Control network IP address must be assigned
- VLANs must be set up
- Trunks must be set up
- Power must be on
Core Services server
- Ethernet cables connected
- Fibre Channel cable must be connected
- Softwaremust be installed, as from the factory, including QuickTime 7
- Control network IP address must be assigned
- Power must be on for all servers
K2 RAID chassis
K2 RAID Expansion chassis (optional)