Power connection sequence
The following table lists the sequence of behaviors you should expect
to see and/or hear as you connect the first power cable to a normally operating
K2 Summit system. If you observe behaviors other than
those listed, refer to related topics in
"K2 Summit Production Client Service Manual" to investigate potential
problems.
In this time… | On the K2 Summit system front panel or chassis, look/listen for the following… | If not, refer to the following. |
---|---|---|
0 seconds | Power supply fans go on and stay on. | Power supply problems |
Power on LED goes on and stays on. | ||
Drive busy LED goes on then off. | Media disk problems |
This power connection sequence assumes that before power was removed, the K2 Summit system was properly shut down from AppCenter, from the Windows operating system, or from the standby button. If the power was removed without a proper shutdown, when the first power cord is connected the K2 Summit system might go directly to the startup sequence.