Other Topic Library Versions

Power off remaining K2 SAN devices

  1. Power-off all Ethernet switches.
  2. Power-off the control point PC and/or the SNMP manager PC, if necessary.
The K2 SAN is powered off.

Copyright © 2015 Grass Valley USA, LLC. All rights reserved. K2 Summit 9.4 gvtp_20150218_00:14:46