Other Topic Library Versions

Powering on the control point PC

Use the following procedure to power on K2 SAN’s control point PC and verify proper operation during power up of the system.
  1. Power up and log on to the PC using standard Windows procedures.
  2. Start and log on to the SNMP manager.
  3. The SNMP manager reports devices as offline. As each device of the K2 SAN is powered on, check the SNMP manager to verify the device’s status.

Copyright © 2015 Grass Valley USA, LLC. All rights reserved. K2 Summit 9.5 gvtp_20151106_14:27:14