Power connection sequence

The following table lists the sequence of behaviors you should expect to see and/or hear as you connect the first power cable to a normally operating K2 Summit system. If you observe behaviors other than those listed, refer to related topics in "K2 Summit Production Client Service Manual" to investigate potential problems.
In this time… On the K2 Summit system front panel or chassis, look/listen for the following… If not, refer to the following.
0 seconds Power supply fans go on and stay on. Power supply problems
Power on LED goes on and stays on.
Drive busy LED goes on then off. Media disk problems

This power connection sequence assumes that before power was removed, the K2 Summit system was properly shut down from AppCenter, from the Windows operating system, or from the standby button. If the power was removed without a proper shutdown, when the first power cord is connected the K2 Summit system might go directly to the startup sequence.


Copyright © 2017 Grass Valley Canada. All rights reserved. K2 Summit 9.7 gvtp_20170117_17:59:42