Power Cycle

  1. If not already in Java iKVM mode:
    • On both Nodes, select: Remote Control / Console Redirection / Launch Console
    • In lower left corner: Keep then click once to run the Java applet then select Continue | Run | Yes
  2. Set up screen so you can see both Java iKVM screens.

    CAUTION:
    Next steps may take several iterations to achieve success as depends on timing.
  3. On Node1, select: Power Control | Set Power On

    Watch carefully for the next 1-2 minutes.

  4. When white splash screen appears, mouse click on it and press F11 key multiple times until you get the boot device screen as shown below. Screen may appear several times so be ready.
  5. Once Node 1 is done, do the same process on Node 2.
  6. If the F11 key doesn’t work and system boots, select Power Control | Set Power Reset on both screens and retry.
  7. Success looks like the following with the ATEN Virtual CDROM YSOJ option. Failure won’t have that option.


Copyright © 2021 GVBB Holdings SARL and Grass Valley USA, LLC. All rights reserved. Specifications are subject to change without notice. AMS Express gvtp_20210507_00:49:21