Preparing for GV I/O installation
If you received your GV I/O server from the factory, it has been configured with the necessary software and all server functionalities.
- Procure the software installation files for this release via the appropriate distribution method, such as download, network drive, or external drive.
- Connect the Control and FTP/SMB network cables to RJ45 10G network ports.
- Allow the GV I/O Live Ingest and Playout Server to boot up for the first time, and name the server when prompted to after the first log in.
- Configure the Control network. Work with the IT personnel at the site to configure Domain, DNS, DHCP, or any other settings required by the site’s LAN.
- Add the GV I/O Live Ingest and Playout Server to a domain, or update and use hosts files.
- Install the latest SiteConfig application.
- Install the latest Discovery Agent.
- Install all Important Windows updates.