Other Topic Library Versions

Unpacking

The FT server ships packaged as shown below.

You will need two or three people to unpack and rack the FT server safely.

To unpack the shipping box:

  1. Cut the plastic bindings holding the outer box to the pallet and lift the outer box vertically to access the contents.
  2. Lift off the accessory box and check for the contents listed below:
    • Assorted hardware for installing enclosure and side brackets
    • CD with OS software
    • Front bezel
    • Rack mount side brackets
  3. Remove the 4RU enclosure with backplane and optical drive installed.
  4. Remove the two identical CPU I/O modules.
  5. Install the brackets and 4RU enclosure, then the CPU/IO modules and front bezel as described in the installation instructions for these items.

Copyright © 2019 Grass Valley Canada. All rights reserved. GV STRATUS 6.8 gvtp_20190318_01:43:25